Bring us the full part number and the date you need it. Request sourcing for obsolete chips, supply gaps and specialist components—or review another route for your design.
Availability, price and delivery are confirmed by quotation. A part shown on this page is not a stock offer.
ONE REQUIREMENT, THREE POSSIBLE ROUTES
Keep the design—or plan the change.
Tell us which constraints are fixed before considering another part.
01 / SOURCE
The exact component
For maintenance, a fixed BOM or a production shortage. Include the complete suffix, minimum usable quantity, date-code limits and permitted delivery splits.
Quotation checkpoint
Source evidence, condition, lot details, quantity, price and delivery—subject to confirmation.
No example matches. You can request any complete MPN, including parts outside our catalogue.
Not listed here? Send your part number. We also accept enquiries for memory, analog, power, interface, discrete and specialist components.
MANUFACTURER NOTICE DESK
Dates that affect a sourcing decision.
Curated original-source summaries. Notice dates and our source-review dates are separate; historical deadlines do not indicate current availability.
NXP / 202506017DN
Historical deadline passed
Selected NXP legacy devices: final delivery date passed
The notice covers specific orderable parts, including MC14489BDWE and MC56F8002VWL. These rows list no replacement. Ask for an application review rather than assuming an equivalent device.
Notice / revision date
Last-time buy
2025-12-20
Final delivery / shipment
2026-09-20
AMD / Xilinx / XCN23005
Historical deadline passed
Selected Virtex devices: exact ordering number matters
Selected Virtex-4, Virtex-5, Virtex-6 and Virtex-7 ordering numbers are listed for discontinuation, with no direct replacement. This is not a family-wide status. Revision 1.1 removed XC7VX330T-2FFV1761C and refers it to XCN20011.
Notice / revision date
Last-time buy
2024-09-30
Final delivery / shipment
2025-03-31
AMD / Xilinx / XCN20011
Historical deadline passed
Historical V-package migration: retain the original conditions
For XC7VX330T-2FFV1761C, the notice lists XC7VX330T-2FFG1761C as its historical replacement. Retain the notice and referenced package-change conditions; this does not establish current stock, current lifecycle or qualification of your board.
Notice / revision date
Last-time buy
2021-10-02
Final delivery / shipment
2022-04-02
This selection is not a complete EOL feed. Confirm the latest manufacturer revision and the exact affected orderable part before making a purchase or lifetime-buy decision.
MAKE THE REQUIREMENT REVIEWABLE
Ask for evidence before committing.
For the sourcing quotation
Identity: full MPN, package, grade and permitted suffixes.
Supply condition: original packaging, condition, date code, lot and source documentation requested.
Acceptance: inspection or test method, sample size, reporting and rejection criteria agreed in writing.
Commercials: confirmed quantity, unit price, currency, delivery basis, quote validity and return terms.
Schedule: required date, destination and whether partial deliveries help.
No supplier relationship, component authenticity certification or test coverage is implied by a listing. The evidence and accepted scope belong in the quotation.
Can I request a part that is not in the FPGA.io catalogue?
Yes. Send the complete manufacturer ordering number, manufacturer name and required quantity. Include a source document if the part uses an unusual designation. Catalogue coverage does not determine whether an enquiry can be reviewed.
Do you have these obsolete parts in stock?
This page does not publish live stock. The examples explain documented lifecycle cases. Availability, price, source conditions and delivery must be confirmed for the exact part and quantity in your quotation.
My production is stopped. What should I include first?
State the exact MPN, minimum quantity needed to restart, destination and required delivery date. Tell us whether split deliveries are useful and whether alternatives are allowed. Do not remove traceability or acceptance requirements to shorten the enquiry.
Does NRND mean a component is already discontinued?
Not necessarily. TI distinguishes “not recommended for new designs” from last-time-buy and obsolete states. Check the manufacturer's status for the exact orderable part and its notice dates; temporary scarcity is a separate supply question. TI lifecycle definitions ↗
Can an alternative be used without changing the PCB?
Only after the relevant compatibility checks and your approval. A similar function or manufacturer cross-reference alone does not establish matching pins, electrical behavior, firmware, FPGA configuration or thermal performance. Some alternatives require a board revision.
How do I specify traceability and inspection?
Tell us the source documentation, lot/date-code records, condition and acceptance evidence you require. Any inspection, electrical test, third-party work or reporting scope must be agreed before purchase. A quoted scope may contain exclusions; review these with your quality team.
Can you support a small maintenance quantity or an unusual component?
Submit the requirement for review. Minimum quantities and viable sourcing routes depend on the exact component and available lot. We cannot promise that every discontinued part can be found.
YOUR REVIEW OUTPUT
Compare offers without losing the acceptance conditions.
Use one row per exact-code offer. This is an original enquiry worksheet, not a representation of available inventory.
Offer comparison inputs · editorial update October 20, 2026
Record separately
Question to resolve
Keep open until confirmed
Exact identity and permitted changes
Does the offer match every character of the required MPN, or is it a proposed alternative?
Any difference in package, grade, speed or special suffix needs its own disposition.
Quantity and delivery window
What quantity can be offered for the required date, and are split deliveries acceptable?
A quotation request or old listing is not a confirmed allocation.
Lot, condition and documentation
Which lot/date-code, condition and source records are included in this particular offer?
Ask what is unavailable; do not assume the same records accompany every lot.
Inspection and acceptance
Which inspection or test outputs are proposed, what are the exclusions, and who accepts the result?
A planned test is not a completed test or a guarantee of application suitability.
Keep a supplier’s commercial offer separate from the board change record. If an alternative is allowed, retain the original BOM code, candidate code, applicable manufacturer documents and the engineering verification owner. Comparing prices before aligning these conditions can hide differences that matter more than the unit price.
For an archived example of why table roles matter, XCN20011 v1.0, page 2, Table 4 distinguishes affected and replacement ordering codes. Its historical relationship does not establish the availability or acceptance evidence of a current offer. Source scope rechecked October 20, 2026.