Repair and sourcing task: freeze the boot and software baseline before an urgent repair for XC7Z045-3FFV900E. Use the manufacturer’s exact affected-code row, the technical limits below and the identity worksheet to prepare a controlled purchase or change record. Current stock, price, delivery and lot condition are unverified.
1. Preserve the affected code and the dated replacement row
Xilinx XCN20011 v1.0 was issued on 2020-09-28. Its Table6 on page4 lists XC7Z045-3FFV900E in the affected Part Number column and XC7Z045-3FFG900E in the paired Replacement Part column. The notice describes a transition from selected V package products to G package products and states package compatibility. Preserve that manufacturer statement accurately, while keeping the offered lot and application acceptance as separate decisions.
Page5 gives last-time buy 2021-10-02 and last shipment 2022-04-02; it also describes an 2021-08-02 NCNR milestone and an 2022-10-02 quality-related replacement RMA deadline. These are historical milestones. They do not reopen an ordering window or promise present supply. The notice applies to the exact listed V code; it does not establish that the listed G candidate is currently active or stocked.
Open the XC7Z045-3FFG900E technical record for a source-based candidate comparison. Keep the original requirement and any permitted alternate explicit. The hard-to-find sourcing workflow explains how to retain an original-code request when an alternate has not been accepted.
2. Matching silicon resources does not reconstruct a system
The historical same-row G candidate preserves the base device and -3E suffix, but a board repair still needs its controlled boot artifacts, hardware handoff, software image and configuration records. An archive containing only a bitstream cannot explain how the processing system was initialized or which board revision it belongs to. List the missing artifacts and assign a recovery action before purchasing around an assumed drop-in system. Keep functional boot evidence separate from electrical and timing acceptance. No boot test or board qualification has been performed for the candidate described on this page.
| Source-backed checkpoint | This device/package | What remains to verify |
|---|---|---|
| PL logic | 218,600 LUTs; 900 DSP slices | Mapped resources, placement and application timing |
| Block RAM | 545 × 36 Kb blocks | Width/depth, ports, clocks and actual packing |
| Package exposure | 362 PL I/O; 16 GTX channels; separate 128 PS I/O | Ball assignment, bank conditions and interface requirements |
| Grade | -3E; 0 to +100 °C junction | Actual operating envelope and applicable timing model |
| Body and pitch | 31 × 31 mm; 1.0 mm nominal pitch | Exact outline, thermal stack and approved PCB land pattern |
Resource figures come from DS190 v1.11.1, page3 Table1. Grade and rail conditions come from DS191 v1.18.1, pages3–4 Table2 and its notes. Package exposure and body/pitch come from UG865 v1.9, pages9–11. These named revisions support the stated facts; check the documentation applicable to the final design. Use the power-rail worksheet to record rail-specific requirements, and the cross-reference review to separate geometry from electrical and software evidence.
3. Choose the route and preserve unresolved evidence
Original-code sourcing: request XC7Z045-3FFV900E, the component quantity and the required delivery date. Ask for the offered full code, lot identifiers, traceability, handling evidence and an agreed inspection or test scope. A quotation, marking photograph or old datasheet is not a test certificate for that shipment. Retain open findings until evidence resolves them.
Historical-candidate review: treat XC7Z045-3FFG900E as the manufacturer’s listed candidate and retain its separate ordering string. Review the actual package drawing, assembly process, power rails, constraints, programming/build records and acceptance plan. Preserve the manufacturer’s compatibility statement alongside the result of your own controlled change process; neither should be replaced by a generic “same pins” note.
Redesign: if the original system cannot be recovered or the sourcing route is unsuitable, write down its processor/software dependency, interfaces, memory, clocking, startup and fault behavior before choosing another device. Use the BGA assembly scope page to organize the manufacturing evidence needed for the board revision. A different base device or package requires more than changing a BOM label.
View the replacement-review sequence

4. Export an identity worksheet before sending an inquiry
Enter the requested and offered full MPNs separately in the interactive identity worksheet. Use a component quantity rather than a reel or tray count. Mark the source evidence as checked only after reading its exact row and entering the document revision and locator. The tool creates a local record and a quotation link; it does not send an inquiry or approve the candidate. Unknown fields remain unresolved.
XC7Z045-3FFV900E identity and offer record
Enable JavaScript to use and download the worksheet, or copy the static record.
Static worksheet
Requested MPN: XC7Z045-3FFV900E Offered full MPN: Component quantity: Notice / revision / exact row: Board revision / build identifier / software baseline: Matching silicon resources does not reconstruct a system: Lot identifiers / traceability / handling evidence: Inspection or test scope / acceptance record: Open findings / responsible reviewer / disposition:
For an original-code inquiry, use the exact-model quotation form and replace the example quantity of 25 with your actual need. Keep alternate permission explicit; an exact identity match does not establish condition, provenance or engineering suitability.
Original source and scope
Xilinx XCN20011 v1.0 original discontinuation notice, pages1,4–5. Technical references: DS190 v1.11.1 (2018-07-02), DS191 v1.18.1 (2018-07-02), UG865 v1.9 (2021-07-28). The linked candidate record supplies their source trail. Numerical scenarios are explicitly hypothetical; no board measurement, lot authentication, current inventory or substitution approval is asserted.