FPGA DEVICES · ENGINEERING · SOURCING Source-linked information. Clear project requirements.

Hard-to-find

1893CKLFT: match the PHY label, reel and board requirements before buying

Published · Updated

When a service BOM calls for 1893CKLFT, the immediate job is to establish what a supplier is offering and whether the board owner can accept it. This Renesas / IDT Ethernet PHY appears in a manufacturer discontinuance notice. Its historical ordering table also distinguishes the full order code, commercial grade and tape-and-reel supply from the marking placed on the device. Those distinctions are more useful than a generic promise of a compatible replacement.

This sourcing dossier helps a maintenance buyer assemble an evidence request for the exact part and keep any redesign proposal separate. It uses original manufacturer records, makes unresolved package and clock details explicit, and provides a local offer-check worksheet. Availability, price and delivery are unknown until a real quotation is obtained. No device, lot or board has been tested for this article.

Read the reel label and the chip marking as different evidence

A purchase order code is not the chip markingHistorical ordering table: ICS1893CKLFT identifies the tape-and-reel commercial row; its marking is 1893CKLF. Conceptual document comparison, not a real package photograph.KEEP THREE IDENTIFIERS IN SEPARATE FIELDS2024 affected order code1893CKLFT2010 ordering-table rowICS1893CKLFTMarking field in that row1893CKLFA missing carrier letter on the marking is not proof of fraud.
Original comparison of documentary identifiers; not a package photograph. On small screens, scroll the diagram horizontally.

A purchase request for 1893CKLFT should preserve that complete ordering number. Renesas lists this exact code in PLC 230018. The manufacturer-linked historical data sheet uses the longer ICS1893CKLFT form in its ordering table, while the marking column for that row reads 1893CKLF. Keep those three strings in separate fields. They come from different document contexts and answer different questions. A supplier quotation, a reel label and the top of a chip are not interchangeable identity records.

The historical ordering row identifies a commercial-temperature, lead/Pb-free, 56-lead MLF2 device supplied on tape and reel. The corresponding row without the final T is not described as tape and reel. That is a useful purchasing distinction, but it does not authorize silently replacing one quoted ordering number with another. An assembly line may need a particular carrier, orientation, leader length or packaging condition. Those requirements belong in the purchasing specification even when an engineer believes that two devices could perform the same electrical function.

Do not reject a lot merely because a photographed marking lacks the final T. The original table explicitly separates the ordering number from the marking. Equally, a photograph containing the expected letters cannot establish authenticity or a complete chain of custody. Ask for a legible original reel or outer-container label, the supplier's exact quoted code, quantity and lot identifiers. Request the original image files when cropped screenshots hide the context. Preserve any inconsistency as an unanswered question rather than assigning it a counterfeit score.

Temperature grade is another reason to read the whole row. The historical commercial entry specifies 0 to 70 °C; neighboring industrial entries specify −40 to 85 °C and contain an additional I. The existence of those rows does not qualify an industrial-code offer as a substitute, nor does it establish that either code is available. Changing a BOM line needs a documented decision about the required temperature range, the actual device, its package, and the board's operating environment. In particular, an ambient temperature range should not be relabeled as junction temperature.

A useful identity record contains four items: the requested code exactly as written on the maintenance BOM, the supplier's complete offer code, the observed marking, and the manufacturer document supporting the interpretation. If the supplier offers an ICS-prefixed historical label, record that fact and request traceability to the Renesas-listed affected code. Do not alter the requested code in your purchasing system solely by deleting a prefix. The goal is a reviewable connection between records, not an automatic string rewrite.

Historical data sheet, page 125, Figure 11-1 ordering table; read the original table.

Use the exact discontinuance row to separate three dates

The historical order and shipment windows are differentPLC 230018: issued January 3 2024, last order July 3 2024, last shipment January 3 2025. Dates do not describe current inventory.PLC 230018 / EXACT AFFECTED ROW2024-01-032024-07-032025-01-03Notice issuedLast orderLast shipmentReplacement field: NoneA later offer needs its own lot, storage and supply evidence.
Original timeline of the cited notice, order and shipment dates. No current inventory is implied. On small screens, scroll the diagram horizontally.

Renesas PLC 230018 names 1893CKLFT in the affected-part table on page 2. The row gives a notice date of January 3, 2024, a last-time-buy date of July 3, 2024, and a last shipment date of January 3, 2025. The replacement column says None. These dates describe the manufacturer's historical withdrawal process. They do not say how many devices are currently held by a supplier, what those devices cost, or whether a particular offer can satisfy your delivery schedule.

Last order and last shipment are separate milestones. A maintenance team may have placed an accepted order before the ordering cutoff and received it later within the shipping window. Conversely, an inventory listing that appears after both dates does not extend either deadline. It is a separate commercial offer requiring its own provenance, storage and inspection evidence. Record the date of that offer separately from the manufacturer notice so that a later quotation does not make an old lifecycle notice appear newly issued.

The notice states that shipments between the last-time-buy and last-shipment dates are non-cancellable and non-returnable. Renesas also reserves the right to decline or cancel orders that cannot be filled through reasonable commercial effort. Those historical terms should not be copied into a present-day FPGA.io quotation as though a current supplier had agreed to them. Ask for today's commercial terms in writing. Distinguish a supplier's proposed return policy from the original manufacturer's withdrawal terms, particularly when inspection, documentation or qualification must occur before a maintenance build can use the material.

“None” in the replacement column is a precise and limited fact. It means the cited row does not name a replacement. It does not prove that no engineer could redesign the board, and it does not endorse the first part returned by a cross-reference search. Keep exact-part sourcing and redesign as separate routes. For an unchanged service BOM, retain 1893CKLFT as the requested device. For a redesign, create a separate proposed-component record with its own evidence and qualification owner.

Save the notice, page number and affected row with the purchasing record. The linked historical data sheet is identified in its footer as Rev. K, 05/13/10, while some running headers still say Rev. J. Preserve that discrepancy in the document register instead of silently harmonizing the labels. It is a reason to record the file and hash used for review; it is not, by itself, evidence that a particular semiconductor lot is unsuitable.

PLC 230018, pages 1–2; read the original discontinuance notice.

Screen the package and operating context before discussing an alternate

Review the Ethernet signal path before proposing a substituteConceptual MAC to PHY to magnetics to port chain. No pin assignment, layout or validated replacement is implied.A PHY CHANGE IS A BOARD REVIEWMACPHYMagneticsPortMII timing / supply / clock / reset and strapsPackage and exposed pad / magnetics / board validationConcept only — not a schematic, pinout, footprint or tested design.
Original conceptual interface chain; not a schematic, pinout, footprint or validated design. On small screens, scroll the diagram horizontally.

The Renesas exact-part record describes 1893CKLFT as a 56-lead VFQFPN package, code NLG56, with an 8 × 8 mm body and 0.5 mm pitch. The historical ordering table calls its package MLF2. Those labels should remain attached to their sources. A familiar package acronym or the same lead count does not establish a matching land pattern, exposed pad, pin assignment or assembly profile. Obtain the applicable manufacturer drawing and compare it with the board's controlled library before approving a physical change.

Figure 10-2 on data-sheet page 124 is specifically titled for ICS1893CK and contains a general package drawing with multiple dimensional variants. Its 56-lead entry uses an 8 × 8 mm body, and the common table gives 0.50 mm basic pitch. It also contains thermal-base dimensions and a separate special non-JEDEC box. A buyer should not select a thermal-pad dimension from that figure without resolving which package variant applies. The figure is not a PCB land-pattern recommendation, solder-stencil design or proof that a replacement will solder correctly on the existing board.

The commercial recommended operating conditions in Table 9-2 identify ambient temperature from 0 to 70 °C and a VDD supply range of 3.14 to 3.47 V, measured relative to VSS. Treat these as document-scoped operating conditions. Do not substitute the absolute maximum table for a recommended supply range. Also do not infer compatibility with every 3.3 V controller from a supply label: the relevant interface voltage thresholds, loading, timing and reset behavior still need to be compared under their stated conditions.

The board review must follow the actual signal path. Identify the controller or MAC, the PHY interface, the reference clock, reset circuitry, configuration straps, magnetics and connector. A PHY replacement may require more than adapting copper. Firmware can depend on management-register behavior, addresses and startup sequencing. The existing design can also depend on a particular clock source and its electrical characteristics. The current exact-part web table contains an ambiguous crystal-frequency field; this dossier deliberately does not repeat it as a validated clock requirement.

For a repair using the original ordering code, recover the released schematic, BOM and board revision before using those records to check an offer. For a proposed alternate, make a comparison matrix with separate rows for supply conditions, MAC interface, pin functions, reset and straps, clocking, package and thermal connection, software behavior, and manufacturing constraints. An unanswered row remains unknown. Matching rows do not constitute qualification; they identify what the engineer can test next. Bench results and design sign-off must come from the real board, not from a generated diagram or a procurement worksheet.

Exact-part record; data sheet, Table 9-2 on page 99 and Figure 10-2 on page 124. Scope and unresolved drawing variant are stated above.

Turn a supplier offer into a useful evidence request

An offer dossier separates product identity from lot evidenceConceptual evidence folders for exact ordering code, package and carrier, lot history and board review. No source is sufficient on its own to authenticate a part.BUILD AN OFFER DOSSIER, NOT A CONFIDENCE SCORE1Exact order codeQuote line + manufacturer definition2Package and carrierLabel + handling / assembly constraints3Lot and storage historyTraceability + gaps made explicit4Board owner reviewOriginal part or controlled changeMissing evidence remains an open action; it never becomes a pass.
Original evidence checklist; having a document is different from accepting its contents. On small screens, scroll the diagram horizontally.

Begin with a practical question: what would prevent this particular lot from entering the intended maintenance build? An exact-code mismatch, unclear carrier, untraceable repackaging or missing storage record creates different work. Ask for the evidence that answers the specific gap. A generic request for “all certificates” can produce a folder of documents that never connects the quoted quantity to the physical material. Write down the quantity, lot identity and the point in the chain each document actually supports.

For the original part, request the complete ordering number, the proposed quantity, available lot and date-code information, package and carrier identification, and the supplier's stated traceability. Where material has been split, repacked or transferred, ask how the new container remains connected to the earlier records. Do not assume that a date code proves storage quality, remaining usable life or successful testing. A relatively recent marking does not establish authenticity, and an old marking alone does not decide whether the material can meet the controlled acceptance process.

Separate evidence availability from evidence acceptance. The supplier may provide a photograph or a certificate; the responsible reviewer must still decide whether it covers the exact offered lot and the intended requirement. Keep the original file, its source and the review result. If an inspection or test is proposed, define its scope and limitations before relying on the result. This page does not provide a counterfeit determination, a reliability warranty or an engineering release, and the checklist does not convert missing information into a pass.

The offer-check tool below is intentionally narrow. Enter the supplier's quoted code and the observed marking to produce a list of identity questions. It compares the quote with the required 1893CKLFT string and uses the historical 1893CKLF marking field only as a reference. It does not search inventory, validate a manufacturer serial number, decode an arbitrary date code or approve an alternate. Enter a positive device quantity when you are ready to prepare the enquiry. An unchanged exact-part request should remain distinct from any separately proposed redesign.

Use the resulting checklist to brief the buyer and board owner together. The buyer owns the current commercial offer and the requested delivery; the engineer owns the use conditions and the acceptance of a design change. Record which questions are closed, which remain open and who must answer them. If the supplier cannot establish the required identity or traceability, preserve the gap instead of filling it with assumptions. If no exact material can be qualified, carry the board constraints into a controlled redesign assessment rather than treating a family recommendation as a drop-in replacement.

Relevant next steps are the complete-order-code lesson, the lot-history evidence guide and the manufacturing-package checklist. Each serves a different task: the first separates ordering and marking, the second organizes provenance questions, and the third captures board and assembly inputs. They are methods, not substitute recommendations for this Ethernet PHY. There is currently no approved alternate named by this dossier. Stock, price and lead time remain subject to a real supplier response.

Original purchasing workflow. It is not a manufacturer authentication service or engineering qualification.

1893CKLFT offer questions

Runs locally. No inventory lookup, authenticity score or compatibility approval.

The interactive worksheet loads here. If it is unavailable, use the static worksheet below.

Enter an offer to generate questions. No result is an approval.

Static worksheet if the tool is unavailable
  1. Keep the requested 1893CKLFT and supplier code in separate fields.
  2. Record the marking; the historical ordering row gives 1893CKLF.
  3. Ask for carrier, lot, traceability and storage evidence.
  4. Leave package-variant and board applicability questions with the engineering reviewer.
  5. Request the exact part on the homepage with your required quantity; do not submit private documents through a URL.
Watch the concept order-code comparisonConcept animation of complete ordering-code comparison, not an inspection of 1893CKLFT

Text explanation: transcribe the requested and proposed order codes, locate each difference, then request the manufacturer definition. A match does not authenticate the lot or qualify a board substitution.

Request the exact part or discuss a board change

Use the homepage to request 1893CKLFT with your required quantity, delivery and traceability needs. Keep a proposed alternate in a separate review. For a wider board project, describe the scope directly in the homepage form.

Request 1893CKLFT on the homepage Discuss the board requirement

Prepared with AI assistance from the cited manufacturer records. No human engineering certification, device testing, current stock verification or substitute approval is claimed.

Back to Hard-to-find →

Source addresses and citation trail

Full source addresses are retained below. Read each citation with its document revision, page, table and applicability conditions above.

  1. https://www.renesas.com/en/document/dst/1893c-datasheet?r=7170
  2. https://www.renesas.com/en/document/eln/plc-230018-end-life-process-select-parts?r=13431
  3. https://www.renesas.com/en/products/1893c/part-details/1893cklft