# FPGA board manufacturing handoff
FPGA.io / KB Group Co.,LTD · Version 1.0 · 2026-09-29

Use one revision-controlled package for quotation and engineering review. This checklist does not state that a manufacturing capability or test service has been accepted.

## Project scope
- Project / PCB revision / assembly revision:
- Quantity and delivery schedule:
- PCB only / assembly only / sourcing plus assembly:
- Technical and purchasing contacts:
- Required inspection and documentation:

## File register
| Deliverable | Filename / revision | Included? | Owner | Open issue |
|---|---|---|---|---|
| Fabrication data and board outline | | | | |
| Stack-up and material requirements | | | | |
| Impedance requirements and applicable nets | | | | |
| Drill / via specification | | | | |
| BOM with exact manufacturer ordering codes | | | | |
| Centroid / placement data and coordinate convention | | | | |
| Assembly drawings and polarity markings | | | | |
| Programming files and release identification | | | | |
| Test procedure / fixture / acceptance criteria | | | | |

## Component and BGA review
- Approved alternates and named approval authority:
- Customer-supplied material, quantity and packing:
- Package drawings, land patterns and pin/ball maps:
- Moisture sensitivity / storage / handling requirements from supplier documentation:
- Assembly constraints and rework expectations:
- Traceability and inspection records requested:

## Test boundaries
| Requested check | Equipment / fixture responsibility | Acceptance criterion | Quoted / pending confirmation |
|---|---|---|---|
| Electrical / continuity | | | |
| Assembly inspection | | | |
| Programming | | | |
| Functional test | | | |

Distinguish inspection, programming and functional testing. An assembly quote does not automatically include a fixture, application firmware, environmental qualification or full functional coverage.

## Release gate
- All files refer to the same approved revision:
- Open engineering questions resolved by:
- Written sourcing / fabrication / assembly / test scope agreed:
- Approval reference and date:

Project preparation: https://fpga.io/engineering/
Manufacturing scope: https://fpga.io/pcba-bga-assembly/
Quotation: https://fpga.io/rfq/
Do not put confidential Gerber/BOM files or credentials into public forum questions.

Permission: copy and adapt this FPGA.io worksheet for internal or commercial engineering work; retain this attribution in redistributed copies. No third-party manufacturer documents are included. This checklist does not replace engineering release or a project-specific manufacturing agreement.
